Veticon's Australian Projects
 


Home Page
Principal Consultant

The Vetiver System

Australian Projects
Agriculture
Infrastructure
Wastewater
Contaminated Land
Mining

International Projects

Contact Us

     

Contaminated Land Projects

Erosion and leachate control on landfill site

 

Judy Holt Park is a rehabilitated landfill site in the Redland Shire near Brisbane. However erosion and leachate discharge on the side slope were often severe in the wet seasons. Rehabilitation in the past has not been successful because the site was highly contaminated with heavy metals such as Arsenic, Cadmium, Chromium, Copper, Nickel, Lead, Mercury, Selenium and Zinc. Due to the high level of tolerance to these heavy metals and rapid growth of vetiver grass, VS was able to effectively reduced leachate discharge and rehabilitate the highly erodible side slopes.

 

 

 

Rehabilitation of contaminated land

  The upper reach of the Tingalpa Creek in the Redland Shire was heavily contaminated with heavy metals resulting from the use of alum for water treatment in the past and also illegal dumping of industrial wastes. VS has been used to stabilise the creek banks and rehabilitate the contaminated land at the site.  
   

 

 

Optimised for viewing with Microsoft Internet Explorer 5 or Netscape Navigator 7 at 1024 x 768 resolution, with JavaScript and Cascading Style Sheets enabled.

Copyright © 2004 by Veticon Consulting Pty Ltd. All Rights Reserved. Site Design by S. Truong

Disclaimer